1NextGen Electrolysis - Blending Equipment

Wales & West Utilities Limited

Estimated Value

Not specified

Deadline

Not specified

Published

6 February 2026

Type

goods

WalesGBselectiveCPV: 39340000CPV: 39340000-KA06
CategoryGoods & supplies

Overview

WWU require a supplier to design and install a hydrogen blending unit and associated equipment to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process.

The customer process is non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer. The blending infrastructure will need to be able to meet the requirements set out in the scope.

These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE a copy of which can be found in Appendix 1 in the scope. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec.

Details

Blending equipment
Natural gas inlet: Pressure: 75 mbar inlet, Temp: -5 to 40 C, Max consumption: Daily - 25384.11 kWh, Max consumption: ½ Hourly - 1191.88 kWh, Mean consumption: Daily - 20175.21 kWh, Mean consumption: ½ Hourly - 435.96 kWh Hydrogen: Max H2 production: 45scmh (4.5kgH2/hr), Pressure: 2 to 7 bar from electrolyser but will be reduced to match the NG inlet, Temp: 60C from electrolyser but short run of pipe to blending tee so -5 to 60C Blended outlet: Injection into existing 3" steel pipework at 75 mbar The blending unit will be required to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process. The customer process in non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer. The blending infrastructure will need to be able to meet the requirements set out in the below Requirements section. These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec. FUNCTIONAL REQUIREMENTS HYDROGEN PRESSURE REGULATION AND METERING Hydrogen pressure regulation and control is required to ensure there is sufficient pressure at the point of injection into the customers system. Pressure regulation and control shall be to IGEM/TD/13 and or IGEM/TD/23. Hydrogen volume and energy flowrate are required and the metering system shall be appropriate for hydrogen that is compliant with Table 5 of IGEM/H/1 and Table 2 of PAS 4444. ACCURACY The hydrogen metering system should meet the accuracy requirements of Table 2 of the Functional Blending Specification in Appendix 1. HYDROGEN/GCV CONTROL Hydrogen injection rate shall be controlled so as to achieve: a minimum gross calorific value of gas at the comingled point a hydrogen content of the blend that is no greater than a maximum of 20% by volume a Wobbe index of the blend that is no less than the lower Wobbe limit permitted by Schedule 3 of the GSMR.GAS SAMPLING AND ANALYSIS HYDROGEN SUPPLY Gas sampling and analysis shall continuously or continually monitor the hydrogen supplied to the hydrogen blending unit . COMINGLED POINT Gas sampling and analysis shall continuously or continually monitor the blend at the comingled point and provide confirmation that it is compliant the minimum requirements agreed with WWU. A schedule of parameters that shall be monitored is given in Table 1 of the Functional Blending Specification. Calorific value shall be determined using an instrument approved by Ofgem for determination of calorific values for the purposes of determining the reference point against which flow weighted average calorific value (FWACV) capping shall apply. The instrument shall comply with the requirements listed in an appropriate Letter of Approval from Ofgem. ACCURACY The gas analysis system(s) shall meet the accuracy requirements of Table 3 of the Functional Blending Specification in Appendix 1. REMOTELY OPERATED VALVE A Remotely Operated Valve (ROV) shall be supplied, which shall be capable of manual remote or automatic closure in the event of variation in blend outside of the agreed conditions or inability to provide sufficient blending where this is practiced. A more detailed description of trip and reset philosophy is given in the Gas Quality and Supervisory system functional block. The means of actuation of the ROV shall be the choice of WWU. FWACV FUNCTIONALITY The system shall deliver the functionality required for the FWACV regime, namely requirements set out in the Gas (COTE) Regulations. Conditions currently specified include the following: Acquisition and storage of gross CV of the supplied hydrogen from the approved CV determination device, together with a flag indicating its quality/suitability for use. For non-continual CV determination devices, the System - CV determination device interface shall be such that only one value of each CV determination is acquired. Acquisition and storage of instantaneous volumetric flowrate of hydrogen at the time of acquisition of gross CV. Initiation of daily calibration of CV determination device. Automated tests of apparatus and equipment at periods not exceeding 35 days in accordance with Regulation 6(e) of the Gas (COTE) Regulations. The facility to manually initiate tests of apparatus and equipment either by, or at the request of, the Gas Examiner. Provision of a report of results of automated or manual tests in accordance with Regulation 6(e) of the Gas (COTE) Regulations. Calculation of the daily average CV of the hydrogen at the end of each Gas Day in the manner specified by the Letter of Direction or by WWU depending on site specific conditions. This will require confirmation of the quality of individual records (records are Good if the CV determination device is operating within agreed limits) and averaging of only those records that are Good and for which gas is flowing past the sample point. In addition, a flag shall be stored indicating whether the resulting daily average CV is Valid (i.e., the maximum time between Good records is less than 8 hours). Gross CV values during calibration or tests of apparatus and equipment shall not be included for averaging. Acquisition and storage of integrated daily volume at the end of the Gas Day. In addition to local storage of individual data acquired, appropriate means of secure transfer of data to WWU Any software and hardware solutions are acceptable provided they deliver the required FWACV functionality, but WWU will require demonstration that the required functionality has been delivered. GAS QUALITY AND SUPERVISORY SYSTEM The Gas Quality and Supervisory system shall monitor hydrogen and blend quality signals from the hydrogen blending unit instrumentation, the remote monitoring unit instrumentation and the delivery facility instrumentation. Monitoring shall be continuous or continual and provide confirmation that the blend at the comingled point is compliant with the requirements set out by Table 1 of the functional blending specification. In the event of an excursion in any of the parameters or any other parameters agreed by risk assessment (see 6.2 in the full blending specification document) the trip system shall initiate closure of the ROV on the hydrogen feed and prevent further injection of hydrogen into the customer process. The system should revert to a pure natural gas feed to ensure that customer operations are not interrupted. The limit values in the parameters of Table 1 are indicative and site-specific values shall be agreed during design approval and may be subject to review if risk assessment confirms such a requirement (see 6.2 in the full blending specification document). All alarms and trips shall therefore be configurable. If closure of the ROV has been initiated because of non-compliance with the parameters in Table 1 or any other parameters agreed by risk assessment (see 6.2 in the full blending specification document ), then its subsequent opening shall be under the sole control of WWU. DESIGN APPROVAL ASSETS OWNED BY WWU Design approval for all assets owned by WWU shall be managed in accordance with IGEM/GL/5 and T/PM/GL/5. TESTING ASSETS OWNED BY WWU Pressure testing of all pressure containing components and systems shall be carried out in accordance with Management/Work Procedure PT/1 pertaining to WWU. Testing of electrical and instrument systems and equipment shall be carried out in accordance with BS 7671 and BS EN 60079-14. COMMISSIONING AND INITIAL VALIDATION GENERAL REQUIREMENTS All personnel carrying out commissioning and initial validation shall be competent and adequately trained to do so. A written commissioning procedure shall be agreed and shall take into account relevant Permit to Work procedures. Initial validation shall be carried out in order to demonstrate the accuracy of the measurement system complies with the requirements of Table 2. Suitable systems, software or procedures shall be provided or agreed to ensure that compliance can be demonstrated. ASSETS OWNED BY WWU Following satisfactory commissioning, validation of the flow and gas quality measurement system shall be carried out in accordance with the relevant parts of T/PR/ME/2 or an alternative documented procedure if appropriate. OPERATION CONTROL AND MONITORING OF CALORIFIC VALUE The requirements for control and monitoring of calorific value shall be agreed in the with WWU. WWU shall at appropriate intervals calculate an appropriate target CV so as to minimise the risk of FWACV capping and communicate its value to the DFO and the hydrogen blending unit. The hydrogen injection flowrate shall be controlled so as to ensure that instantaneous CV at the comingled point does not fall below the prevailing target CV, subject to: hydrogen content of the gas at the comingled point shall not be greater than that permitted by WWU Wobbe index of the gas at the comingled point shall not be less than that permitted by the WWU. CONTROL AND MONITORING OF GAS QUALITY Gas Quality of the gas at the comingled point shall be monitored so as to ensure compliance with the requirements set out by WWU. The frequency of monitoring shall be determined though measurement risk assessment. The supplier will also need to consider : • Carry out a full Hazid/Hazop for integration into the whole system. • Identify the impact on the downstream process • Any potential storage needed to require a consistent blend Not required • Odorant injection

Additional details

Connect electrolyser to inlet of blending equipment via designed pipework. Connect existing natural gas pipework into blending equipment inlet.

Connect blending equipment outlet to the customers' existing gas service , downstream of the meter Carry out all civils for the Hydrogen blending equipment and pipework. Note : WWU reserve the right to carry out Work package 2 to inform future learnings of the gas networks activities.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

Wales & West Utilities Limited
Typepublic body
RegionUKL21
Total tenders32
Total spend£192,247,603
View buyer profile

Key Dates

Published

6 February 2026

Submission deadline

Not specified

Notice type

award

Source

find a tender

Similar

Related Tenders

S
Open
ocds-h6vhtk-06b673 · tenderUpdate

Supply and delivery of heavy and municipal vehicles

Scotland Excel
goodsScotland

This is in relation to the renewal framework for the supply and delivery of Heavy and Municipal Vehicles, available for all 32 council areas in Scotland and Scotland Excel Associat

£Up to £100,000,000
⏱ 16 Oct 2026
Posted · today3d left →
E
Open
ocds-h6vhtk-07862c · tender

EDC/2026/4456 framework for traffic signal equipment maintenance, supply & associated works

East Dunbartonshire Council
goodsScotland

East Dunbartonshire Council wishes to establish a public contract (within the meaning of the Procurement Regulations) and appoint a number of suppliers under an overarching ranked

£Up to £2,260,000
⏱ 12 Nov 2026
Posted · yesterday30d to apply →
S
Open
ocds-h6vhtk-06f051 · tenderUpdate

FC - TPPLPSBUS01 - purchase of 6x coachbuilt buses

Stockton on Tees Borough Council
goodsNorth East

The contract is for the purchase of six new coach‑built buses to replace ageing vehicles used in a community transport service. It is aimed at suppliers who can provide suitable, road‑legal buses for public transport purposes.

£On request
Posted · yesterdayView details →
N
Open
ocds-h6vhtk-0785f4 · tender

Dental implants, digital services & associated products

NHS Greater Glasgow and Clyde
goodsScotland

NHS Greater Glasgow & Clyde (NHS GGC) require suitably qualified, experienced and licensed contractors to undertake the provision of Dental Implants, Digital Services and Associate

£On request
⏱ 11 Nov 2026
Posted · yesterday29d to apply →