WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4)
Balfour Beatty VINCI Systra JVEstimated Value
£10,000,000 – £20,000,000
Deadline
12 June 2026
Published
28 May 2026
Type
works
Overview
WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall Scope of Works: Working in partnership with HS2, the BBVS Joint Venture is responsible for the final design, construction, and commissioning of the HS2 Old Oak Common station in West London.
The station is the London interchange station of the UK's second high-speed railway. It will be located on the site of the now demolished Old Oak Common Railway Depot, bounded by the Crossrail Depot to the north, the London Overground West London line to the east, the Intercity Express Programme Depot to the south and Old Oak Common Lane to the west.
HS2, Great Western Main Line (GWML), Crossrail and Heathrow Express services will be served by the new Old Oak Common Station. HS2 Old Oak Common Station will provide a state-of-the-art gateway to London and the wider area, with efficient intermodal interchange with rail, taxi, cycle and pedestrian modes.
Additional details
Old Oak Common Lane highways package involves all the lowering, widening and realignment of the Old Oak Common Lane highway, inclusive of temporary / permanent access routes, removal of redundant utilities, installation of final utilities and civils works along Old Oak Common Lane and Wells House Road (incl. retaining walls). BBVS is seeking to contract under NEC3 Option A with a contractor to deliver Old Oak Common Lane highways package of works that includes the following elements in summary: i.
IEP Depot temporary & permanent access route (incl. retaining wall construction / realignment) ii. Old Oak Common Lane highway lowering, widening & realignment (incl. street furniture, lighting and signage) iii.
Removal of all redundant utilities within the highway iv. Installation of final utilities and telecoms including but not limited to clean water, foul sewer, storm sewer, non-contestable telecoms and UKPN works v.
Old Oak Common Lane / Wells House Road civil engineering works including but not limited to new retaining walls and remediation of existing retaining walls The scope of the subcontract includes but not limited to: A. The provision of all necessary People, Equipment, Plant and Materials (temporary or permanent) to deliver RIBA 5 Design, mock-ups, temporary works, fabrication, installation, and certification of the associated works B.
The Subcontractor will need to demonstrate that they have the capabilities and resources to deliver the size and nature of this project in a rail environment. The Subcontractor will be required to produce & submit 2D/3D designs in native dgn files, working on projectwise and other software platforms.
The Subcontractor will be required to liaise with organisations such as Transport for London, Crossrail Depot, Network Rail and Thames Water and other project stakeholders. Programme It is currently anticipated that the site works will be predominantly completed between Q1 2028 and Q1 2032, with a preconstruction
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Useful Resources
Buyer Profile
Balfour Beatty VINCI Systra JVKey Dates
Published
28 May 2026
Submission deadline
12 June 2026
Notice type
Contract
Source
contracts finder
Related Contracts
Refurbishment works Harris Academy Beckenham
As detailed in tender pack
CA18042 - Tender 29/2026 - PEACEPLUS PP1020 - St Monicas Boxing Club - Creation of Extension to Club Facilities
This is a construction contract to build an extension to St Monica's Boxing Club that will add toilet facilities, an office, and a kitchen. The work also includes building an internal steel mezzanine (raised platform) in the existing gym with a soundproofed room for counselling, plus all associated electrical work and finishing. The contract is managed under NEC4 ECSC Short Contract terms.
Singlegate Primary School boiler replacement works
Singlegate Primary School needs a new boiler installed during the summer holidays in 2026 (between 21 July and 31 August). This is a straightforward replacement project that must be completed while the school is closed, and all bidding happens through the London Tenders Portal.
WC1928003 - NDT TESTING OF ABOVE GROUND JPTS TANKS T9 & T10, CYPRUS
This is a contract to inspect and repair two large fuel storage tanks (T9 and T10) at a British military airbase in Cyprus. The work involves checking the tanks for damage using special testing methods, blasting and repainting the inside surfaces, fixing any problems found, and servicing the pressure valves on top.