Supply Chain Notice: WAT0149-01 B Lock Penstock Replacements- Portsmouth Naval Base
Ministry of DefenceEstimated Value
£3,500,000 – £0
Deadline
18 June 2026
8 days remaining
Published
27 May 2026
Type
goods
Overview
The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project location- HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.
The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity. KBS Maritime - Introduction KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability.
The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.
Additional details
Project Background KBS Maritime has a requirement for penstock replacements at B Lock within Portsmouth Naval Base. The project consists of 10 in number replacement penstocks in 6 chambers overall.
The penstock system controls sea water via a culvert system between the harbour, the basin and the dry docks. These include levelling penstocks of circa 8 metres deep to drainage penstocks circa 18 metres deep.
The replacement programme will replace the current cast irons doors with new with specification to be agreed along with the associated shafts, wedges, door nut, brackets, platforms, ladders and actuation and road plates. This project is due to commence in Q4 2026 with all to be replaced by Feb 2030.
Contractors must be able to demonstrate design, manufacture and installation of penstock replacements in a marine environment including all site management under CDM regulations and competency of Health and Safety compliance and safe practices. Contractors must also possess at least five years' experience working within a marine environment.
Contractors who do not provide suitable and sufficient evidence of this will not be considered. Key Dates (approximate) - Expressions of Interest close: 18/06/2026 - Bidders Selected: by end of June 2026 - ITT Published: early July 2026 - ITT Close: early September 2026 - Project commencement: December 2026 - Project Completion Feb 2030
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Useful Resources
Buyer Profile
Ministry of DefenceKey Dates
Published
27 May 2026
Submission deadline
18 June 2026
Notice type
Contract
Source
contracts finder
Related Contracts
SUPPLYING LOOSE TECHNICAL EVENT EQUIPMENT TO BRIGHTON DOME
Brighton Dome and Festival Ltd (BDBF) has been awarded a grant from Arts Council England following a successful application to the Creative Foundations Fund. The grant has been awa
NORBURY SCHOOL GRASS RESURFACING & DRAINAGE PROJECT (HA1)
Norbury School needs a contractor to replace a failed artificial grass sports surface (565 square metres) and install a new drainage system. The work must be completed during the summer holidays between July and September 2026 so the school can reopen on time without disrupting pupils and staff.
Bangkok Congestion Charge Policy Detailed Legislative Development
The UK Government's PACT programme is looking for a specialist or team to help Thailand's transport ministry turn their congestion charging policy for Bangkok into actual laws and rules. You'll be drafting legislation and working with Thai government officials to get the policy ready for implementation by 2029-2030.
Electric heating
Perton Parish Council wants you to design, supply, install, and test electric radiators in their Civic Centre. This is a complete heating system project including all wiring, controls, and commissioning work to get the building fully heated and operational.