Buyer profile
Dorset Healthcare University NHS Foundation Trust
Get alerts when Dorset Healthcare University NHS Foundation Trust publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
91
Known spend
£12m
90 disclosed
Average value
£131,375
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
A Hammond & Sons Ltd
4 winslatest 19 Aug 2026£2m
- 2
Spetisbury Construction Ltd
4 winslatest 26 Aug 2026£1m
- 3
Sinewave Electrical Contractors Ltd
4 winslatest 22 Sept 2026£423,219
- 4
Westmade
4 winslatest 01 Jun 2026£219,961
- 5
SCI Fire Protection
3 winslatest 29 May 2026£351,096
- 6
Southern Piped Services
3 winslatest 27 Aug 2026£251,749
- 7
A S Mechanical & Electrical Ltd
3 winslatest 03 Jul 2025£172,123
- 8
Dixon Mechanical Services
2 winslatest 26 Feb 2026£504,855
- 9
Wessex Site Inspection
2 winslatest 14 May 2026£270,000
- 10
UEP SWITCHGEAR LTD
2 winslatest 17 Feb 2026£119,130
What they buy
By CPV categorySewage, refuse & cleaningCPV 90
1 contract · £201,477
Financial & insuranceCPV 66
1 contract · £135,387
Architectural & engineeringCPV 71
1 contract · £50,000
Health & social workCPV 85
1 contract
Tender activity
Notices published per month — last 24 months
All contracts (91)
DHC DH1360 vehicle fleet insurance
Vehicle Fleet Insurance
Weymouth neighbourhood scheme RIBA 1 & 2 architectural services
The contract is for architectural services covering RIBA Stage 1 (feasibility) and Stage 2 (concept design) for the Weymouth Hospital Neighbourhood Scheme. It is aimed at firms that can produce the required design studies for this local regeneration project.
St leonards electrical panel board replacement works
Backlog life cycle replacement works to replace the mains electrical panel board serving St Leonards Hospital and the wheelchair centre
Wareham hospital hot water plant replacement works
Removal of old gas fired hot water boiler plant and upgrade to Plate heat exchanger
11 Shelley road window installation and external decoration works
Backlog programme for works to remove all weather deteriorated sash windows and redecorate
Kings park mortuary and medical records store demolition works
Backlog programme to remove all redundant out buildings from KPU - mortuary and medical records stores
DHC DH1389 recovery houses and step-down bed provision
The requirement is for the provision of community based short-term residential stays, providing care for those in a mental health crisis, as an alternative to hospital admission an
Mental health rehabilitation intensive supported housing programme
To provide an intensive supported housing programme within the east of the county for adult patients with a serious mental illness and longer term rehabilitation needs. The supplie
Twynham ward door replacement works
Replacement bedroom doors with anti-barricade function
Outbound interface from system C EPMA to omnicell
The Omnicell cabinets require an interface to be able to work with the System C provided EPMA system, with a maintenance and support package to aid the installation.
Synertec provision of DMSK and podiatry postage of letters
Provision of Musculoskeletal (MSK) and Podiatry postal of appointment letters to patients This STW is an update to support creation of a call off order.
CQC community mental health patient annual survey
Mental Health Community Survey IQVIA Annual survey - 3 year contract
Ulysses annual licence & support contract
12 Month Annual licence and support renewal
UKAS iqips accreditation inspection
IQIPS (UKAS) inspection Audiology for 5 trust sites
INR star licence for warfarin patients
INR Star group license renewal - Anticoagulation dosing software/database
St leonards L&D refurbishment works phase 1
Phase 1 enabling works for St Leonards L&D refurbishment works for Canford Ward
Westminster hospital fire stropping works
Fire safety works funded by NHSE following fire compartmentation survey for Westminster memorial hospital
Thorlux lighting works for st leonards L&D refurbishment
Works to replace lighting at St Leonards hospital as part of the L&D Refurbishment
Westhaven hospital fire precaution works
Remedial works required to ensure the fire integrity of the building
CACI synergy costing system subscription renewal
Renewal of the CACI Synergy Costing Software - One year contract