Costain Limited (H7-Heathrow)
Total contracts
6
Known spend
£18m
6 disclosed
Average value
£3m
Per contract
Active suppliers
0
Last 5 years
Top suppliers
Last 5 yearsNo award data captured yet for this buyer.
What they buy
By CPV categoryArchitectural & engineeringCPV 71
3 contracts · £15m
Construction worksCPV 45
3 contracts · £3m
Tender activity
Notices published per month — last 24 months
All contracts (6)
WP6235 -T5D MEP Subcontractor
Expression of Interest T5D MEP Subcontractor T5D Attenuator Overhaul (Survey / RIBA 4iii) Scope The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and ca
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Expression of Interest Tunnel Vent, Fans and Fan Drives MEP Subcontractor Tunnel Vent, Fans and Fan Drives (Survey and RIBA 4) Scope The objective of this scope is to replace compo
WP1140 - T5D Design Consultant
The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and can be accessed from the bottom (Level 6) via the trackside of the HEX tunnel or from the top (lev
WP3380- Hard Landscaping (lot 1), Soft Landscaping (lot 2), & Kerb modifications (lot 3) and edge protection - CTA Main Works
Soft Landscaping There is a requirement for a subcontractor who can support us with our soft landscaping requirements. Removal of existing undergrowth on embankment side and replan
WP3380- Hard Landscaping (lot 1), Soft Landscaping (lot 2), & Kerb modifications (lot 3) and edge protection - CTA Main Works
This is a landscaping and infrastructure contract split into three separate packages (called 'lots'). The buyer needs a contractor to remove and replant vegetation on a steep slope (soft landscaping), lay a permeable tarmac surface for an evacuation area (hard landscaping), and modify road kerbs plus install edge protection and security fencing. The work involves hazardous conditions near live traffic, footpaths, and fire suppression systems.
WP4730 - Security Fencing CTA Tunnel
We have a security fencing requirement as part of our CTA tunnel main works 1100mm high key clamp rail - 30m + 30m 2400mm high green security mesh - 60m +26m 1200mm high green secu